What a construction quotation should tell you it leaves out

Back to all guides

Last reviewed 18 November 2026

What a construction quotation should tell you it leaves out

The rate per square foot is only part of what you spend on a new house. When you compare construction quotations in Karachi, two builders can quote rates that look close, yet the final cost of the two homes can be very different. The difference is usually hidden in what each rate does not include.

A quotation is honest when it also tells you what is not in the rate, so you can plan for it. In ours, the exclusions are written down and shown beside every figure. This guide lists each one, explains why it sits outside the construction rate, and tells you when in the project you will need to plan for it.

Why exclusions matter as much as the rate

A construction rate covers the work and materials of building the house. Some costs around a house are not construction at all. Land, approvals and utility deposits are paid to other parties. Others depend entirely on your own taste and budget, such as appliances, furniture and air-conditioning. If these are mixed into a rate, the rate stops being comparable.

Listing exclusions clearly helps you in three ways:

  • You can compare like with like. A lower rate is sometimes lower only because it leaves more out.
  • You can plan your total budget. You know from the first day which costs are yours to arrange, and when they fall due.
  • There are no surprises at handover. Nothing you assumed was included turns out to be an extra.

Costs not included in the construction rate, grouped by when they come up: before building starts, your upgrade choices, and moving in

Before building starts

These costs come before construction or sit outside it. Most are paid to other parties, not to the builder.

Land

The construction rate is for building the house only. The plot, and any transfer or registration costs that come with it, are separate.

Design fees

Architectural and structural drawings are prepared before construction begins, and their fees are not part of the construction rate. The drawings decide the layout, the structure and much of the final cost, so it is worth agreeing on them before you finalise a quotation.

Soil investigation

A soil investigation tests the ground on your plot so that the foundations can be designed for it. It is carried out before the structural design is finalised and is paid separately.

Bahria Town approvals and PMT charges

Approvals and charges set by Bahria Town, including PMT charges, are paid by the owner and are not part of the construction rate. Ask Bahria Town for the current charges that apply to your plot before you finalise your budget.

Utility connection deposits

Deposits for utility connections, such as electricity and water, are paid to the providers and are not part of the construction rate.

Your upgrade choices

Imported or higher-priced selections

Our quotations name the materials and fittings that the rate covers. If you choose imported items, or higher-priced tiles, sanitaryware or fittings than those named, the difference is not in the rate. Any such change is recorded as a written variation that shows the price difference and the effect on time, so you approve the cost before anything is ordered.

To move in and live

These items are chosen around how you want to live in the house. Because they vary so much from one family to the next, they are kept out of the rate.

Kitchen appliances

The kitchen itself, with cabinets and granite worktops, is included in our turnkey scope. Appliances such as the cooker, hob, oven, hood, fridge and microwave are not.

Air-conditioning

Air-conditioning units are not included. Decide early how many rooms you want air-conditioned and where the units will go, so the house can be planned around them.

Solar, generator and UPS

Backup and solar power are not included. Their size depends on your load and budget, so they are planned and bought separately.

Loose furniture and curtains

Beds, sofas, dining tables, curtains and other loose furniture are not included. Built-in wardrobes and the kitchen are part of our turnkey scope.

Landscaping

Lawns, plants and garden landscaping are not included in the rate.

Swimming pool

A swimming pool is not included in the rate per square foot.

CCTV cameras and NVR

In our turnkey scope the cabling for CCTV, TV and internet is laid in advance, so you do not need to run cables across finished walls later. The CCTV cameras and the NVR (the recorder) are not included, so you can choose the system that suits you.

Questions to ask any builder

The exclusions are one half of comparing quotations. The other half is how the builder handles materials, payment, price changes and defects. Before you sign with anyone, ask these five questions. Our quotation answers each of them in writing.

Five questions to ask any builder before you sign, with our written answers: named materials, inspected payment stages, material price rises, written variations, and the defects period

1. Does the quotation name the cement, steel and other materials, or just say “good quality”?

“Good quality” or “A-grade” leaves room for substitution. Our answer: every material is named. We use Falcon cement (sulphate-resisting up to the plinth, OPC above it), Amreli Grade 60 steel with its mill certificate, Anmol sand, Hub crush and machine-made blocks.

2. Is payment tied to inspected stages, or to dates?

Payment by date can run ahead of the work on site. Our answer: 12 instalments, each due on joint inspection of the stage, when you and our team look at the work together before the next payment is asked for.

3. What happens if material prices rise?

On a project that runs for months, cement and steel prices can move. Our answer: we absorb material price rises of up to 5%. Above that, the owner pays the difference, and only on materials that are still to be bought.

4. Are changes written down, with the price and time effect?

Verbal changes are the most common source of disputes. Our answer: any change to the agreed scope is a written variation showing the price difference and the effect on time. Nothing is substituted without your written approval.

5. Is there a defects period after handover?

Our answer: we give 12 months defects liability on workmanship after handover.

Frequently asked questions

Why is the rate per square foot not the full cost of a house?

The rate covers construction: the work and materials of building the house. Land, design fees, soil investigation, approvals, utility deposits, appliances, air-conditioning, backup power, furniture, landscaping, a swimming pool and CCTV equipment are separate costs.

Are Bahria Town approval charges included in the construction cost?

No. Bahria Town approvals and PMT charges are not included in the construction rate.

Is the kitchen included if appliances are not?

Yes, in our turnkey scope. The kitchen with its cabinets and granite worktops is included. The appliances are not.

Is CCTV included?

In turnkey, the CCTV cabling is included, along with TV and internet cabling. The cameras and NVR are not.

What if I want imported tiles or fittings?

You can choose them. The price difference is recorded in a written variation that you approve before anything is ordered.

See the exclusions beside your figure