Build
Grey structure and turnkey homes
Grey structure and turnkey homes on one fixed rate per square foot, built in inspected stages.
Eight stages, each inspected
Each stage is inspected before the next one starts.
- 01
Site and excavation
- 02
Foundations and underground tank
- 03
Plinth
- 04
Ground floor frame
- 05
First floor frame
- 06
Roof and overhead tank
- 07
Services and plaster
- 08
Envelope and completion
Structure materials
- Falcon cement (sulphate-resisting to plinth, OPC after)
- Amreli Grade 60 steel (ASTM A615, mill certificate)
- Anmol sand and Hub crush
- 6x8x12 in machine-made blocks
- Red Meranti door frames
- 18-gauge main gate
Finishing
- Stile / Master 2x4 ft porcelain floors (allowance PKR 2,600-3,000 per m²)
- Granite steps and worktops
- Red Meranti solid doors with Khaas hardware
- MDF kitchen and wardrobes
- Porta wall-hung sanitaryware, Porta / Grohe fixtures
- Lucky / Prime aluminium windows with 6 mm glass
- Jotun paint
- Pakistan Cables wiring, Schneider breakers, Clipsal switches
- COB lighting and gypsum ceilings
Also included
- TV, internet and CCTV cabling
- Intruder alarm
- Main staircase to roof with mumty
- Main gate
- Testing of plumbing, drainage, tanks, roof and electrical circuits
- Site clean-up and handover
Not included
- Land
- Design fees
- Soil investigation
- Bahria Town approvals and PMT charges
- Utility connection deposits
- Kitchen appliances
- Air-conditioning
- Solar, generator and UPS
- Loose furniture and curtains
- Landscaping and pool
- CCTV cameras and NVR
- Imported or higher-priced selections
12 instalments that follow progress
Percentages of the contract value, each due on joint inspection of the stage. Rates updated 2026-11.
| Stage | Share |
|---|---|
| At agreement | 15% |
| Plinth | 10% |
| Ground-floor slab | 10% |
| First-floor slab | 10% |
| External plaster | 5% |
| Internal plaster | 5% |
| False ceiling, primer and plumbing | 5% |
| Tiles and stair steps | 10% |
| Wardrobes and doors | 10% |
| Kitchen and washroom fixtures | 10% |
| Railing, stair steps and lights | 5% |
| Final paint and completion | 5% |
Terms
- Material price rises up to 5% are absorbed by the contractor; above that the owner pays the difference on materials still to be bought.
- Each instalment is payable within 7 days of the stage notice, once the stage has been jointly inspected.
- 12 months defects liability on workmanship after handover.
- No silent substitutions: any change is a written variation showing only the price difference and time effect.
See our sites
Villa of 272 sq yd delivered in Precinct 08, Bahria Town Karachi
Watch on YouTube (opens YouTube)Excavation of a new project: 272 sq yd, Precinct 08, Bahria Town Karachi
Watch on YouTube (opens YouTube)Pouring work update, Precinct 8, Bahria Town Karachi
Watch on YouTube (opens YouTube)Foundation work of a residential site
Watch on YouTube (opens YouTube)Ali Block villa construction update
Watch on YouTube (opens YouTube)
ADNAN ASSOCIATES