Build

Grey structure and turnkey homes

Grey structure and turnkey homes on one fixed rate per square foot, built in inspected stages.

Eight stages, each inspected

Each stage is inspected before the next one starts.

  1. 01

    Site and excavation

  2. 02

    Foundations and underground tank

  3. 03

    Plinth

  4. 04

    Ground floor frame

  5. 05

    First floor frame

  6. 06

    Roof and overhead tank

  7. 07

    Services and plaster

  8. 08

    Envelope and completion

Structure materials

  • Falcon cement (sulphate-resisting to plinth, OPC after)
  • Amreli Grade 60 steel (ASTM A615, mill certificate)
  • Anmol sand and Hub crush
  • 6x8x12 in machine-made blocks
  • Red Meranti door frames
  • 18-gauge main gate

Finishing

  • Stile / Master 2x4 ft porcelain floors (allowance PKR 2,600-3,000 per m²)
  • Granite steps and worktops
  • Red Meranti solid doors with Khaas hardware
  • MDF kitchen and wardrobes
  • Porta wall-hung sanitaryware, Porta / Grohe fixtures
  • Lucky / Prime aluminium windows with 6 mm glass
  • Jotun paint
  • Pakistan Cables wiring, Schneider breakers, Clipsal switches
  • COB lighting and gypsum ceilings

Also included

  • TV, internet and CCTV cabling
  • Intruder alarm
  • Main staircase to roof with mumty
  • Main gate
  • Testing of plumbing, drainage, tanks, roof and electrical circuits
  • Site clean-up and handover

Not included

  • Land
  • Design fees
  • Soil investigation
  • Bahria Town approvals and PMT charges
  • Utility connection deposits
  • Kitchen appliances
  • Air-conditioning
  • Solar, generator and UPS
  • Loose furniture and curtains
  • Landscaping and pool
  • CCTV cameras and NVR
  • Imported or higher-priced selections

12 instalments that follow progress

Percentages of the contract value, each due on joint inspection of the stage. Rates updated 2026-11.

Payment schedule
StageShare
At agreement15%
Plinth10%
Ground-floor slab10%
First-floor slab10%
External plaster5%
Internal plaster5%
False ceiling, primer and plumbing5%
Tiles and stair steps10%
Wardrobes and doors10%
Kitchen and washroom fixtures10%
Railing, stair steps and lights5%
Final paint and completion5%

Terms

  • Material price rises up to 5% are absorbed by the contractor; above that the owner pays the difference on materials still to be bought.
  • Each instalment is payable within 7 days of the stage notice, once the stage has been jointly inspected.
  • 12 months defects liability on workmanship after handover.
  • No silent substitutions: any change is a written variation showing only the price difference and time effect.