Checklist
Before you sign with any builder
Eight questions to ask us, or anyone else. If the answer is not in writing, ask for it in writing.
- 01
Is the price a fixed rate per square foot, in writing?
A vague price grows later.
How we answer: One rate per square foot, in an itemised written quotation valid for 30 days.
- 02
Are payments tied to stages you have inspected?
Paying in advance leaves you with no hold on the work.
How we answer: 12 instalments, each due on joint inspection of the stage, payable within 7 days of the stage notice.
- 03
Does each stage get inspected before the next one starts?
Hidden work cannot be checked later.
How we answer: Grey structure runs in 8 stages, each inspected before the next.
- 04
Are the materials named, with test records?
Cheap material hides inside the walls.
How we answer: Brands are listed in the quotation (for example Falcon cement and Amreli Grade 60 steel with mill certificate).
- 05
What is not included?
Exclusions are where budgets break.
How we answer: The quotation lists what is not included, such as land, design fees, approvals and utility deposits.
- 06
How are changes handled?
Silent substitutions and surprise bills.
How we answer: No silent substitutions. Any change is a written variation showing only the price difference and time effect.
- 07
What if material prices rise?
The contract should say who pays.
How we answer: We absorb material price rises up to 5%. Above that, you pay the difference only on materials still to be bought.
- 08
What happens after handover?
Faults often show after you move in.
How we answer: Joint snag inspection at handover, then 12 months of defects liability on workmanship.
Want these answers for your plot? Send the plot size and area and we will reply with a written estimate.